warning
İlan yayından kaldırılmıştır
İstanbul(Asya)(Ataşehir)

İş Yerinde

İş Yerinde

Job Type

Full-Time

Years of Experience

8 - 10 years of experience

Department

Other

Other

Application Count

999+ application

Job Type

Full-Time

Years of Experience

8 - 10 years of experience

Application Count

999+ application

Department

Other

QUALIFICATIONS AND JOB DESCRIPTION

LOOKING FOR FULL TIME ARCHITECT (DESIGN & SITE FINISHING WORKS) FOR OUR ISTANBUL FINANCE CENTER PROJECT IN ATASEHIR, ISTANBUL

Position Description:

The Site Architect position will be assigned to the field operations team and will control documents for the project from start to finish. Responsible for specific technical design aspects of an assigned project, including investigation, evaluation, and recommendation of design solutions and to assure that the work meets all safety standards, is within schedule requirements, and is constructed to the highest level of quality possible. The Site Architect in the performance of its duties shall be responsible for the protection and promotion of the interest of Turner and all matters.


Essential Duties & Key Responsibilities:

  • Performs general architectural works including architectural design, site visits and inspections and prepares related reports.
  • Reviews CAD drawings, renderings, layouts, study models, construction documents prepared by Architectural Designers. Ensures compliance with applicable codes and standards as well as client requirements.
  • Review all work as it is being placed to be sure it is accurate within accepted tolerances.
  • Review contract drawings, specifications and shop drawings to ensure proper coordination and installation.
  • Assist in the implementation of the site safety program as required and ensure subcontractor compliance with Turner safety standards and all applicable safety codes and regulations.
  • Assist in the maintenance of contract documents and electronic web-based documents for field operations
  • Writes construction specifications and prepares detailed requisitions for equipment and materials when needed. Interfaces with suppliers as required.
  • Develop and recommend procedures for design coordination among consultants, client, and contractors.
  • Participate in design coordination meetings.
  • Coordinates work with engineering and construction units at project site. Reviews, approves, and issues detailed design and construction drawings and specifications prepared by others.
  • Oversee performance of work specifically architectural finishes related to scheduling, delivery, logistics, quality control.
  • Track design documents through use of Project Management Control System (Turner 21). Maintain latest “control copy of documents” and monitor and advise on progress status.
  • Assist with design portion of Project Master Schedule (PMS) and monitor and advise on design progress.
  • Review consultant responses for Request for Information (RFI) process.
  • Assist with development of programs related quality assurance and quality control including Building Information Modelling (BIM) execution plans and management.
  • Assist supervisor with consultant reviews and approvals for construction submittal process.
  • Assist with reviewing contractor change proposals.
  • Review project drawings to identify and avoid conflicts between different discipline drawings.
  • Review shop drawings and submittals to ensure conformance to project requirements
  • Performs other responsibilities associated with this position as may be appropriate.

*Other activities, duties, and responsibilities as assigned.


Qualifications:

  • Bachelor’s Degree in in Architecture plus minimum of 8-10 years of relevant industry experience
  • Large construction project experience a plus
  • Professional attitude with ability to build relationships and foster teamwork
  • Attentive to time management, proactive planning, and responsive to request
  • Able to work independently, with management oversight
  • Must have English language proficiency with professional oral and written communication skills
  • Proficient with computer applications, AutoCAD and MS Office

Work Environment:

While performing the duties of this job, the employee regularly works on-site at the construction work site where  the employee is exposed to moving mechanical parts; high precarious places; fumes or airborne particles; outside weather conditions and risk of electrical shock. The noise in these work environments is usually moderate to very loud.

Turner is an Equal Opportunity Employer

Preferred Candidate

Bachelor’s(Graduate), Master’s(Graduate)
Completed
English(Reading : Advanced, Writing : Advanced, Speaking : Advanced)

Saha Mimarı pozisyonu ile ilgili daha detaylı bilgi almak ya da diğer iş fırsatlarını incelemek için aşağıdaki sayfaları inceleyebilirsiniz.

Saha Mimarı Saha Mimarı Maaşları Saha Mimarı Nasıl Olunur? Saha Mimarı Nedir? Saha Mimarı İş İlanları
Yan Haklar

Özel Sağlık Sigortası.

Saha Mimarı pozisyonu ile ilgili daha detaylı bilgi almak ya da diğer iş fırsatlarını incelemek için aşağıdaki sayfaları inceleyebilirsiniz.

Saha Mimarı Saha Mimarı Maaşları Saha Mimarı Nasıl Olunur? Saha Mimarı Nedir? Saha Mimarı İş İlanları